• NEWS
    • NATION
  • BUSINESS
  • ENVIRONMENT
  • OPINION
    • EDITORIAL
  • FEATURE
  • HEALTH
  • LIFESTYLE
  • LITERATURE
  • SPORTS
  • ELECTION 2025
  • ABOUT US
Tuesday, October 21, 2025
  • Login
The Samar Chronicle
  • NEWS
    • NATION
  • BUSINESS
  • ENVIRONMENT
  • OPINION
    • EDITORIAL
  • FEATURE
  • HEALTH
  • LIFESTYLE
  • LITERATURE
  • SPORTS
  • ELECTION 2025
  • ABOUT US
No Result
View All Result
  • NEWS
    • NATION
  • BUSINESS
  • ENVIRONMENT
  • OPINION
    • EDITORIAL
  • FEATURE
  • HEALTH
  • LIFESTYLE
  • LITERATURE
  • SPORTS
  • ELECTION 2025
  • ABOUT US
No Result
View All Result
The Samar Chronicle
No Result
View All Result
Home News Infrastructure

DPWH readies enforcement of 15-ton restriction plan for Calbiga Bridge

Samar Chronicle by Samar Chronicle
October 21, 2025
in Infrastructure, News
Reading Time: 2 mins read
DPWH readies enforcement of 15-ton restriction plan for Calbiga Bridge

The DPWH 2nd DEO highlights the notable issues of the Calbiga Bridge. (Photo by PIA Samar)

The DPWH 2nd DEO highlights the notable issues of the Calbiga Bridge. (Photo by PIA Samar)

CATBALOGAN CITY (October 21, 2015) — The Department of Public Works and Highways 2nd District Engineering Office (DPWH 2nd DEO) in Samar province held a coordination meeting on October 20, 2025, to discuss the implementation of the 15-ton Gross Vehicle Weight (GVW) restriction for the Calbiga Bridge.

In the structural assessment, the DPWH 2nd DEO identified notable issues, including an abnormal gap at the expansion joint and deteriorated sealant in Abutment 1; damage to the bearing/restraint—steel bed (support) in Pier 1; corrosion on the bottom flange of girders at Span 1; corrosion and section loss in both the right and left railings across all spans; and a loose connection in the additional girder at Span 2.

“The findings are clear. The bridge is showing signs of stress and weakening from years of service and continuous overloading,” said DPWH 2nd DEO District Engineer Herminio V. Gulmatico.

ADVERTISEMENT

According to the DPWH 2nd DEO, the Calbiga Bridge is a steel truss bridge, built in the early 1970s, around the same time as the San Juanico Bridge. Due to aging, fatigue, and deterioration, it can no longer safely support 15 metric tons per lane for vehicles crossing simultaneously in both directions under ideal conditions.

A 15-ton weight limit will be strictly enforced starting October 27, 2025. The traffic rule in Calbiga will include allowing only one vehicle to cross the bridge at a time.

Under the restrictions, no trailers or trucks over 15 tons are allowed, even after reinforcement work. Heavy trucks that cannot lighten their load must reroute through Eastern Samar, exiting at Buray, Paranas, for northbound travel, or Basey for southbound traffic.

The DPWH 2nd DEO suggests alternative logistics such as RoRo or barging, using existing roll-on/roll-off or barge services in strategic locations instead of crossing the bridge directly. Temporary staging areas and re-dispatching points may be set up near both ends of the bridge for trans-shipment or reloading, helping vehicles continue their route while adhering to load restrictions.

“Everyone must understand why this action is necessary. If something unfortunate happens to the bridge, it will not only cause inconvenience but also lead to serious disruptions to mobility, livelihoods, and the local economy, especially since we have no alternative route to serve as a backup,” Gulmatico emphasized.

This urgent action aligns with the policy compliance of DPWH Department Order No. 8, s. 2024, which includes updated guidelines on load posting for bridges, and the Memorandum dated October 7, 2025, for the urgent enforcement of traffic rules regarding maximum load limits for bridges nationwide.

Gulmatico reported that they requested a ₱140 million budget for Calbiga Bridge retrofitting. The budget is pending approval, and once granted, civil works can begin.

He also urged stakeholders, transport groups, truckers, drivers, business sectors, and the public to understand, cooperate, and comply. (By Aaron A. Cotejar, PIA Samar)

Tags: Calbiga bridgeDPWHrestrictionsamar
ADVERTISEMENT
Previous Post

81st Leyte Gulf Landings commemoration ‘honors past, protects future’

Samar Chronicle

Samar Chronicle

Related Posts

81st Leyte Gulf Landings commemoration ‘honors past, protects future’

81st Leyte Gulf Landings commemoration ‘honors past, protects future’

October 21, 2025
High-powered firearms, explosives recovered from NPA cache in San Jorge, Samar

High-powered firearms, explosives recovered from NPA cache in San Jorge, Samar

October 21, 2025

Watershed Under Siege: Calbayog Residents Protest Turbines in Protected Area

Groups Demand Cancellation of Debts

Pagklaro sa Calbayog Pan-as Hayiban Protected Landscape ug sa Gemini Wind Power Project

Pagkaklaro Mahitungod san Calbayog Pan-as Hayiban Protected Landscape (CPHPL) ngan Gemini Wind Power Project

Latest Stories

DPWH readies enforcement of 15-ton restriction plan for Calbiga Bridge

DPWH readies enforcement of 15-ton restriction plan for Calbiga Bridge

October 21, 2025
81st Leyte Gulf Landings commemoration ‘honors past, protects future’

81st Leyte Gulf Landings commemoration ‘honors past, protects future’

October 21, 2025
High-powered firearms, explosives recovered from NPA cache in San Jorge, Samar

High-powered firearms, explosives recovered from NPA cache in San Jorge, Samar

October 21, 2025

Samar Chronicle is an independent news outfit in Samar, Philippines committed to fearless, truthful, and responsible journalism. Operating under Samar Chronicle Publishing Services, SC is a self-sustaining media start-up powered by commercial advertisements, occasional private and government notices, and grants.

Guided by our motto, “Always for the Truth,” we serve as the voice of the people by delivering stories that matter — honest, relevant, and free from compromise. Rooted in Samar but with a vision that reaches beyond, we aim to inform, empower, and inspire our readers toward a more just and transparent society.

For commercial advertisements and public relations publications, please contact us at:

Tel. No. (+63) 968-512-7724
📧 samarchronicle@gmail.com

© 2024 The Samar Chronicle Website Design and Development by Neitiviti Studios.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • NEWS
    • NATION
  • BUSINESS
  • ENVIRONMENT
  • OPINION
    • EDITORIAL
  • FEATURE
  • HEALTH
  • LIFESTYLE
  • LITERATURE
  • SPORTS
  • ELECTION 2025
  • ABOUT US